THIS IS DONE
Dear sir, As discussed, Pls See the Below weekly Phasing, Accourding below pls do phasing in IMIS for uploading the weekly Production Plan, and same PP Report format required in same Phasing, in PP Material Required Received In depots. Weeks PP Form (PPCF5205) Week Format Required PP (Material Received) Week 1 1 To 7 1 To 7 Week 2 8 To 14 8 To 14 Week 3 15 To 21 15 To 21 Week 4 22 To Upto End 22 To Upto End Regards, Lalit Raj, 633.